Estimating and project controls · Edmonton, Alberta

A second estimating desk for contractors whose bid calendar is full.

Schwehr Projects Ltd. does quantity takeoffs, estimates, tender support and project cost control for contractors in Alberta and British Columbia. One person, a fixed fee per bid or an hourly rate for ongoing work, every number traceable to a drawing.

Fixed fee or hourly rateAgreed from the drawing set before any work starts
Remote, across AB and BCBased in Edmonton, with site visits when the job needs one
PDF in, Excel outFiles your estimator can open, check and change

Services

Four things I do, from first drawing set to final cost report.

01 · Takeoffs and estimates

Quantity takeoffs and estimates

Measured from the civil drawing set and cross sections, by station, structure or assembly, then priced with your unit rates and production factors or mine. See estimating for the full build-up.

  • Earthworks: topsoil strip, cut and fill balanced by station, embankment, shrink and swell factors
  • Civil structures and utilities: granular base, asphalt, culverts, pipe and bedding, concrete
  • Scope sheet of inclusions, exclusions, assumptions and RFIs ready to send with the price
More about takeoffs

02 · Tenders

Bid and tender support

Help getting a complete, compliant submission out the door when the deadline is close.

  • Proposal and bid writing to the owner's format and evaluation criteria
  • Review of bid documents, addenda and unit-price schedules for gaps and risk
  • Subcontractor and supplier quote comparison and levelling
More about tender support

03 · Project controls

Cost tracking and forecasting

The reporting a project needs once it is won, set up so the people running it can keep it current.

  • Job cost tracking, budget versus actual and estimate-at-completion forecasts
  • Subcontractor ticket logs, progress claims and change management
  • Schedule build and updates in ProjectLibre or Microsoft Project
More about project controls

04 · Aggregates

Pit and aggregate operations

Controls for producers and the contractors who buy from them, built from years inside aggregate operations.

  • Pit production reconciliation and per-tonne cost tracking
  • Community Aggregate Payment (CAP) levy reporting and compliance
  • Crushing and hauling estimates, including BC MoTI Blue Book and HETS equipment rates
More about aggregate controls

What you get

Every quantity points back to the drawing it came from.

A takeoff arrives as an Excel workbook, not a PDF. Each line carries the drawing, the station or structure, and the measured quantity, so your estimator can check any line in seconds and swap in their own rates.

The same workbook feeds the scope sheet, so inclusions, exclusions and RFIs are written while the quantities are fresh, not reconstructed on bid day.

Sample earthworks takeoff · Access road and culvert crossingIllustrative figures
RefItemLocationQtyUnit
C-101Topsoil strip and stockpile, 150 mmSta 0+000 to 0+6401,152m³
C-102Common excavation, cutSta 0+000 to 0+6404,870m³
C-102Embankment fill, compacted in placeSta 0+000 to 0+6403,215m³
C-201Granular base, 25 mm crushed, 150 mmFull width, 7.0 m1,411t
C-301CSP culvert, 900 mm, with beddingSta 0+41218.0m
Cut and fill balanced per station from the cross sections, with shrink and swell factors on their own column, never buried in the quantity. Rates column left to you or filled on request. The full workbook behind these five lines has the inputs with every cross-section end area, the takeoff, the assumptions and questions, the drawings reviewed, and the rates and production build-up. Fictional job, placeholder rates. Download the sample workbook (.xlsx, 27 KB)

How it works

Nothing to manage on your side.

Step 1

Send the set

Drawings, specs, addenda and the bid form, by email or a shared link. A phone call covers what the documents do not.

Step 2

Fixed quote or hourly rate

A fixed fee and delivery date for a bid, or an hourly rate for ongoing controls work, agreed before any work starts. Site visits are arranged when the job calls for one.

Step 3

Delivered in Excel

Takeoff, estimate and scope sheet in one workbook, with a short walkthrough so your estimator can own it.

Step 4

Invoice on delivery

One invoice, net 30. Ongoing project-controls work is billed monthly under a simple master agreement.

About

Run by a project controller, not a sales office.

I am Vern Schwehr. Before starting Schwehr Projects I was a project controller in aggregate and heavy civil operations in British Columbia, where I owned the estimating, cost tracking, job costing and estimate-at-completion forecasting for the business, including project controls and subcontract management on Trans Mountain Expansion Project scopes.

That work means I have sat on the contractor's side of the table: writing the bid, tracking the tickets, explaining the forecast to the owner. The workbooks I deliver are the ones I would want to inherit.

Before construction I spent seven years in enterprise IT, which is why the spreadsheets are built to be checked, reused and handed to the next person rather than rebuilt each bid.

Vern Schwehr, project controller and owner of Schwehr Projects Ltd.
Tools
Bluebeam Revu, Microsoft Project, ProjectLibre
Sectors
Heavy civil, earthworks, utilities, aggregates and pits
Region
Alberta and British Columbia, working remotely from Edmonton
Entity
Schwehr Projects Ltd., an Alberta corporation

Recent work

Subdivision servicing bid, southern Alberta, October 2026

A civil contractor bidding under a general contractor sent the engineer's construction set: 134 m of 200 mm sanitary main, a 150 mm water main with a live hot tap, services to four lots, road cuts, paving and concrete restoration, in a town that adopts City of Calgary specifications. Six working days later both contractors approved a lump-sum proposal built from a 72-line takeoff, five levelled supplier and subcontractor quotes, a 17-working-day schedule and 14 written clarifications. Four priced issues in between, each with a short walk of what moved and why. When the developer answered the open questions two days after that, the revised proposal went back the same day. Fixed fee, agreed before the drawings were opened.

6 working daysfrom drawing set to approved bid
72 linespriced in the takeoff
5 quoteslevelled from suppliers and subs
4 review roundseach with a walk of what moved

Before you send a drawing set

Four things settled before any work starts.

Confidentiality

Your drawings, rates, quotes and bid strategy are covered by the confidentiality terms of the master services agreement every client signs: used only for your bid, shared with suppliers only as far as a quote needs, never used to support a competing bid on the same tender, returned or destroyed on request. If you want a non-disclosure agreement signed before the first file moves, there is one ready.

Capacity

Send the closing date with the set. The quote back within one business day says yes or no to your deadline, and a yes is a committed delivery date. One person, so the calendar is checked before the quote, not after.

Scope

The fixed fee covers the takeoff, the priced estimate, the scope sheet and one round of your review comments. Addenda and revised drawings issued after the fee is agreed are priced as a change before work continues, so there is no surprise invoice.

Revisions

Every issue comes with a note of what moved since the last one and why. Errors in the work reported within ten business days of delivery are corrected at no charge.

Contact

Have a tender on the board?

Send the drawing set or a short description of the job and you will have a fixed quote back within one business day. First job for a new client is at a reduced fee so you can judge the work before committing to more.

Phone368-380-1467
OfficeEdmonton, Alberta · remote across AB and BC
Profile